Skip to content
Mettalik Gridshells
Back to blog

Space Frame Lifting

Published on Category: Uncategorized

Space frame is assembled in the floor and then lifted to its final position with a 200 Tn capacity crane.

This lifting method allows the assembly of large span structures safely and efficiently on the ground, reducing the time required at height and improving worker safety.